field tie-in and development

Starting from 2007 until now, OGPE has been providing services of engineering, procurement, construction, installation, commissioning (EPCIC), repair, dismantling of Oil and Gas facilities for many major projects for both domestic and international clients, the successes of which have contributed significantly to the revenue of J.V. Vietsovpetro.

SVNE Field Development Project

  • • Client: Cuu Long JOC
  • • Scope of Work: EPCIC
  • • Execution time: 10/2012 – 10/2013
  • • Location: 01 WHP, Pipelines, STV CPP Modification

RC3/RC1 Field Development Project

  • • Client: VSP
  • • Scope of Work: EPCIC
  • • Execution time: 10/2009 – 12/2010
  • • Location: 02 WHP, Bridge, Vent boom

Gas Separator Skid Project

  • • Client: VSP
  • • Scope of Work: EPC
  • • Execution time: 05/2014 – 05/2015
  • • Location: Slug Catcher Vessel, piping, structure, E&I system
  • • Size: 12205mm (L) x 3539mm (W) x 4405mm (H)
  • • Weight: 116,405kg

Thang Long – Dong Do Compact Manifold Skids Project

  • • Client: Lam Son JOC
  • • Scope of Work: EPC
  • • Execution time: 06/2012 – 04/2013
  • • Location: 02 Skids (Production and Test Manifold, Gaslift Manifold, Water Injection Manifold, Closed Drain Manifold, Choke Valves, Multiphase Flow Meter and other items)
  • •Size:
  • o Thang Long Compact Manifold Skid: 13100mm (L) x 3560mm (W) x 5045mm (H) o Dong Do Compact Manifold Skid: 12560mm (L) x 3500mm (W) x 5214mm (H)
  • Thang Long Compact Manifold Skid: 13100mm (L) x 3560mm (W) x 5045mm (H) Dong Do Compact Manifold Skid: 12560mm (L) x 3500mm (W) x 5214mm (H)
  • • Weight:
  • o Thang Long Compact Manifold Skid: 74,581 Kg o Dong Do Compact Manifold Skid: 51,807 Kg

Gaslift Skids Project

  • • Client: VSP
  • • Scope of Work: EPCIC
  • • Execution time: 10/2011 – 09/2014
  • • Location: Gaslift Skids (Distribution Skid, Metering Skid) for BK2, BK3, BK1/10, RP1, RP2, BK5, BK8, BK14/BT7, BK17 platforms.

Wellhead Control Panel (WHCP) Projects

  • • Client: VSP/ PCVL/Cuu Long JOC
  • • Scope of Work: EPCIC/EPC
  • • Execution time: 02/2013 – 03/2016 (WHCP packages for: Su Tu Trang Full Field Development Project; Thien Ung Project; DMDP-A platform; RC1/3, RC4, RC5, RC6, RC7, RCDM, MSP-1, MSP-4, MSP-8, MSP-10, MSP-11 Platforms)

Integrated Control Safety System (ICSS) Projects

  • • Client: VSP
  • • Scope of Work: EPCIC/EPC
  • • Execution time: 2010 – 2016 (ICSS packages for: Thien Ung Project; CPP2, BK4-A, PPD-40000, BK8/BK17, MSP-4, BK5, MSP-1, MSP-8, MSP-10, MSP-11, RP1, RP2, BK3, BK2, RC1/3, RP3, MSP-1, MSP-7, MSP-11 Platforms)