Operation & maintenance of o&g facilities and equipment

O&M is the core service of OGPE. Over the last few years, it has conducted successfully multiple O&M contracts, which contributes greatly to the annual production target of O&G operators domestically and internationally.

O&M OF FPSO TGT ARMADA

  • • Client: Hoang Long JOC
  • • Scope of Work: O&M
  • • Year of Service: since 2009
  • • Location: FPSO Armada TGT-1, TGT field, block 16-1.
  • • Capacity: 55.000bbls/day

O&M OF WHPS

  • • Client: Hoang Long JOC / Thang Long JOC
  • • Scope of Work: O&M
  • • Year of Service: since 2011
  • • Location: WHP H1, H4, H5 – TGT Field, block 16-1 / WHP HST, HSD, block 15-2/1
  • • Capacity: WHP H1: 30,000bbls/day,WHP H4: 8,000bbls/day,WHP H5: 15.000bbls/day,WHP HST/HSD: 15.000bbls/day

O&M of WHP CTC-1

  • • Client: Block 09-3/12 Contractors
  • • Scope of Work: O&M of WHP CTC-1, subsea pipeline, subsea cable…
  • • Year of Service: from 25/01/2019
  • • Products: Oil & Gas
  • • Average Productions: 7,500 bbl/day

O&M OF CNV FIELD

  • • Client: Hoan Vu JOC
  • • Scope of Work: O&M
  • • Year of Service: 2009
  • • Location: WHP CNV, CNV field, block 09-2
  • • Capacity:15.000bbls/day

O&M OF THIEN UNG WHP

  • • Client: VSP
  • • Scope of Work: O&M
  • • Year of Service: 2016
  • • Location: Thien Ung WHP (Jacket, Topside), block 04-3, offshore Vietnam
  • • Deep water level: 120m
  • • Topside: 4,200MT
  • • Jacket: 6,600 MT
  • • Pile: 3,200 MT
  • • Products: Gas & Condensate
  • • Max Capacity: 3mil m3/day

O&M OF DAI HUNG GAS COMPRESSION SYSTEM

  • • Client: PVEP POC
  • • Scope of Work: O&M
  • • Year of Service: 2017
  • • Location: Dai Hung Gas Compression System (Riser, Slug Catcher, Custody Metering System, Inlet Scrubber + Gas Compression Package + Discharge Cooler…) which was installed on Thien Ung WHP, block 04-3, offshore Vietnam by PVEP POC.
  • • Tag No.: 25AQ01
  • • Year of manufacture: 2015
  • • Designed weight: 170,000kg
  • • Size: 16000mm (L) x 3800mm (W) x 10000mm (H)
  • • Max capacity (for compressing associated gas from Dai Hung Field): 1 mil m3/day

O&M OF NAM RONG – DOI MOI FIELD

  • • Client: VRJ Petroleum Company
  • • Scope of Work: O&M
  • • Year of Commencement: 2010
  • • Location: WHP RC4 + RCDM; Nam Rong – Doi Moi unification field; block 09-1 & 09-3.
  • • Quantity: 4,100 bbls/day (updated in Dec 2016)